Employee Workload Measurement Analysis Using the Full Time Equivalent Method in the Operational & Maintenance Division of PT. XYZ
DOI:
https://doi.org/10.31538/mjifm.v5i1.440Keywords:
Workload, Full Time Equivalent, Operational, Heavy EquipmentAbstract
This study aims to measure employee workload in the Operational & Maintenance Division of PT XYZ using the Full Time Equivalent (FTE) method. This method is used to evaluate the optimal number of workers based on available working hours and actual activity time. The analysis results show that the workload of heavy equipment operators such as excavators, trailers, and bulldozers fall into the optimal category, while for cranes there is a shortage of workforce.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Nandy Lara Bestari Utomo, Roziana Ainul Hidayati

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.









