Employee Workload Measurement Analysis Using the Full Time Equivalent Method in the Operational & Maintenance Division of PT. XYZ

Authors

  • Nandy Lara Bestari Utomo Universitas Muhammadiyah Gresik, Gresik, Indonesia
  • Roziana Ainul Hidayati Universitas Muhammadiyah Gresik, Gresik, Indonesia

DOI:

https://doi.org/10.31538/mjifm.v5i1.440

Keywords:

Workload, Full Time Equivalent, Operational, Heavy Equipment

Abstract

This study aims to measure employee workload in the Operational & Maintenance Division of PT XYZ using the Full Time Equivalent (FTE) method. This method is used to evaluate the optimal number of workers based on available working hours and actual activity time. The analysis results show that the workload of heavy equipment operators such as excavators, trailers, and bulldozers fall into the optimal category, while for cranes there is a shortage of workforce.

Downloads

Published

2025-06-25

How to Cite

Utomo, N. L. B., & Hidayati, R. A. (2025). Employee Workload Measurement Analysis Using the Full Time Equivalent Method in the Operational & Maintenance Division of PT. XYZ. Majapahit Journal of Islamic Finance and Management, 5(1), 888–909. https://doi.org/10.31538/mjifm.v5i1.440

Similar Articles

1 2 3 4 5 6 > >> 

You may also start an advanced similarity search for this article.